Adjustment of Castings

Division IV – Page 166 Section 10 – Adjustment of Castings SECTION 10 subgrade has been removed shall be backfilled to within 2 inches of the surface. The remaining 2 inches shall be paved with ½ inch maximum asphalt concrete and compacted with a 3-ton pneumatic steel

Materials - Nebraska Department of Transportation

Materials and Research Lists, Manuals, Guidance. Concrete Repair Manual. Laboratory Quality System Manual. Surface Distress Survey Manual. Standard Test Methods Manual. Pavement Management Systems Manual. Geotechnical Policy & Procedures Manual. Pavement Design Manual. Determination Data Sheet for LPA.

ILLINOIS STANDARD SPECIFICATIONS FOR CONSTRUCTION

item 401 bituminous surface course - superpave 127 division iv- drainage 297 item 701 pipe for storm sewers and culverts 297 headwalls, and misc. drainage structures 315 item 754 concrete gutters, ditches, and flumes 317 division v - turfing 319 item 901 seeding 319

Evaluation of Tack Coat Bond Strength Tests

iv . 1 . Contents INTRODUCTION base courses with asphalt concrete binder and asphalt concrete surface courses, or levelling courses with surface courses, or simply surface courses on top of old asphalt or concrete pavements. Pavement structures are designed to act as solid beams without slippage between

MDOT Standard Specifications for Construction [WEB

i Preface . The Standard Specifications for Constructionis the standard for the basic requirements governing the materials, equipment, and methods used in construction contracts administered by the Michigan Department of

DIVISION IV UTILITY INSTALLATION, CONSTRUCTION AND

concrete pavement, where permitted, shall be done with a concrete saw, in a manner meeting the approval of the Public Services Director. Asphalt pavements shall be cut by a tool leaving a square, neat cut. Pavement shall be cut back so that the pavement opening is twelve inches wider on each side than the width of the

Recycled Aggregate - California

Resources. See the CalRecycle's online Publications Catalog for a complete list of C&D publications, including downloadable Word versions and the option to order hard copies. The links below are to the HTML versions, if available. Recycled-Content Construction Products.A searchable database of manufacturers of recycled construction products sold in California, including aggregate.

APEN and permitting guidance from SBAP (Small Business

Concrete plants. Overview of Air Regulations: Surface Mining, Concrete Batch Plants and Hot Mix Asphalt. Construction. Land Development Guidance Document. Crematories. A Guide to Air Permitting Requirements for Crematories. Dry cleaning. Requirements for Leak Detectors and Monitoring Equipment. Perc Dry Cleaner Environmental Compliance

Specifications and Special Provisions

Division Operations and Maintenance Provisions; Standard Specifications Search; CLASS IV SUBGRADE STABILIZATION IN LIEU OF CHEMICAL STABILIZATION: 2018-05: ASPHALT CONCRETE SURFACE COURSE, TYPE xxx (Leveling Course) 2012-08: SP06 R088R

PDF Cw 3235 - Renewal of Existing Miscellaneous Concrete Slabs

DIVISION 4 - CW 3235 - R9 2.4 Asphalt Material .1 Asphalt material for isolations will be supplied in accordance with Sections 5 and 6 of CW 3410. .2 Asphalt material will be Type II or other asphalt material approved by the Contract Administrator. 3. CONSTRUCTION METHODS 3.1 Miscellaneous Concrete Slab Removal

PDF Standard Construction Specifications for Asphalt Surfacing

Division 40 - Asphalt Surfacing Revised 11/08 SECTION 40.02 SEAL COAT Article 2.1 Description The Work under this Section consists of the performance of all Work required for the construction of a seal coat of asphalt cement and cover aggregate on RAP, strip-paved, and gravel surfaces. Article 2.2 Asphalt

BID PROPOSAL AND CONTRACT Magruder Blvd @ Semple

8 Concrete Curb and Gutter, VDOT Std. CG-3 485 LF 9 2" Asphalt Surface Course, Type SM-9.5A 75 TON 10 4" Asphalt Base Course, Type BM-25.0A 130 TON 11 8" Aggregate Base Course, Type I, Size 21B 250 TON 12 10" Select Material Base (CBR-20) 200 TON 13 Type B Class I Pave. Line Mark. 4" 900 LF

Asphalt Pavement | Caltrans

Asphalt Pavement. 2389 Gateway Oaks Suite# 200. Sacramento, CA 95833. The Office of Asphalt Pavements develops tools, standards, guidance, standard specifications, standard plans, and investigations for the following pavement engineering topics: Asphalt Pavements. Economic Analysis for Pavements.

PDF Florida Department of Transportation

These Florida Department of Transportation Standard Specifications for Road and Bridge Construction, January , are hereby approved for application on highway and related

Concrete Pavement Noise

and implementation of a new grinding process for concrete pavements called the Next Generation Concrete Surface (NGCS) which has also been shown to reduce tire/pavement noise. Both of these options have been used on trial installations in Washingtonbetween 2006 and 2010.

Standard Specifications for Road and Bridge Construction

section 358. repair and preparation of base course .. 187 division 400. surface courses, pavements, rehabilitation, and shoulders section 401. reserved section 402. aggregate surface course .. 189 bituminous surfaces and hot-mix asphalt pavements section 403. bituminous surface treatment

PDF Laboratory Evaluation of the Noise and Durability

Pavements with the following asphalt surface mixes were included in the PPRC SPE 4.16, 4.19, 4.27, and 4.29 projects: Dense-graded asphalt concrete (DGAC), since renamed hot-mix asphalt (HMA) Open-graded friction course (OGFC), with conventional and polymer-modified binders Rubberized hot-mix asphalt—open graded (RHMA-O)

PDF E?A Applicability Of The Asbestos NESHAPToAsbestos Roofing

Surface Preparation Manual Methods Rotating Blade (RB) Roof Cutter Slicer Roof Plow Concrete/Asphalt Planer 4-3 4-3 4-3 4.-3 4-5 5-1 5-1 5-2 5-2 5-5 5-7 5-7 5-9 5.1.7 Power Remover (Power Tear-off Machine) 5-9 5.2 SHINGLED ROOFS 5-12 6.0 DUST CONTROL METHODS 6.1 REMOVAL METHODS 6.1.1 Modified RB Roof Cutter Blade b. 1.

Specification Guidelines for the 2004 Standard

Division I -General Requirements and Covenants (Items 1 to 9): Division I - Earthwork (Items in the 100's): Division II - Subbase and Base Courses (Items in the 200's): Division III - Surface Courses or Pavement (Items 300 to 330): Division III - Surface Courses or Pavement (Items 334 to 368): Division IV - Structures (Items 400 to 426)

SECTION 02515 - Asphaltic Concrete Paving

1. Prepare sub-grade to receive sub-base course. 2. Sterilization of roadway. 3. Place base course, work and compact. 4. Prime base course and place asphalt pavement. B. Related Work Specified Elsewhere 1. Division 2, Section 02200 – EARTHWORK 2. Division 2, Section 02577 – PAVEMENT MARKING 3. Division 3 – Poured Concrete Curbs

PDF Standard Specifications for Construction of Roads and

section 309. — emulsified asphalt-treated base course .. 238 section 310. — cold in-place recycled asphalt base course .. 243 section 311. — stabilized aggregate surface course.. 252 section 312.

Materials & Testing | UDOT

Database Access. Database Development Report (Updated on 15th and 30th of each month) Masterworks Materials Update Report. New Features. Notification Email Recipients Override Process (Updated on 10/6/ ) Contacts. D.Scott Potter: 801-647-3459; [email protected] Tim Wozab: 801-633-7619; [email protected] User Guides.

Table of Contents Section 7010 - Portland Cement Concrete

3.04 Surface Fixture Adjustment 3 3.05 Application and Mixing of Asphalt Emulsion 3 3.06 Grade and Compact Material 4 3.07 Surface Treatment 4 Section 7060 - Bituminous Seal Coat Part 1 - General 1.01 Section Includes 1 1.02 Description of Work 1 1.03 Submittals 1 1.04 Substitutions 1 1.05 Delivery, Storage, and Handling 1

Asphaltic Concrete 409, 415, 416 or 417 20200619

For 416 and 417 only: For courses 1 1/2 Inches or Less in Nominal Thickness, the temperature of the surface on which the asphaltic concrete is to be placed is at least 65 degrees F and the ambient temperature at the beginning of placement is at least 65 degrees F and rising. The placement shall be stopped when the

PDF Bridge Deck Evaluation Manual New York State Department of

corrosion. (See Chapter IV, Section A, "Deck Rehabilitation", for further information on identifying areas for concrete removal. Sounding is used primarily on monolithic decks. On two-course decks (with both concrete and asphalt concrete wearing courses) it is difficult but possible to detect delaminations in the structural

Standard Specifications for Construction of Roads and

309 Emulsified Asphalt Treated Base Cour se..215 DIVISION 400 ASPHALT PAVEME NTS AND SURFACE TREATMENTS Section 401 Superpave Hot Asphalt Concrete Pavement.. 220 402 Hot Asphalt Concrete Pavement By Hveem

Table of Contents Division I – General Provisions Page

Division IV – Bridges and Structures - 400 Series SPs (Supplemental Specifications) Asphalt Concrete Operations 89 - 500 Series SPs (Supplemental Specifications) SS50102 Section 501 – Underdrains 94 1.5” SM-9.5A asphalt surface course overlay and all other work

Office of Materials Technology (OMT) - MDOT SHA

Chandra Akisetty, Division Chief Office 443-572-5051 Toll Free 1-866-926-8501 [email protected] Concrete Technology Division. The Concrete Technology Division is responsible for the acceptance of all concrete materials used on MDOT SHA contracts.

PDF Standard Specifications for Construction and Maintenance

Published in June 2004. This document has been created to further the purposes of §201.053(b)(7) Texas Transportation Code to maximize federal

Standard Specifications for Construction and Maintenance

Standard Specifications for Construction and Maintenance of Highways, Streets, and Bridges Adopted by the Texas Department of Transportation November 1,

What is Superpave? All You Need to Know - Gilson Co

Superpave is an asphalt mix design method that has its roots in a report released back in 1984 by the Transportation Research Board (TRB), America's Highways, Accelerating the Search for Innovation. The report outlined the need for increased state and federal funds to develop badly needed research for better and longer-lasting highways.